Use every mile tied to the trip
If a $1,200 load covers 400 loaded miles, its advertised rate is $3.00 per loaded mile. Add 100 empty miles to pickup and the revenue falls to $2.40 per total mile: $1,200 divided by 500. The second figure is more useful when comparing trips with different empty-mile exposure.
Be consistent about whether you include miles after delivery. If moving to a likely reload area is part of your trip plan, show that estimate separately. If the next load pays for the repositioning, avoid charging the same distance to two trips.
Build a simple floor
Add fuel, driver pay, maintenance allocation, tolls and other applicable costs. At a hypothetical $4.00 per gallon and 7 mpg, 500 miles uses about 71.4 gallons, or about $286 of fuel. If combined trip costs are $950, break-even is $1.90 per total mile. The estimated margin in that example is $250 before any costs you excluded.
Compare two offers in the same format
Put rate, loaded miles, deadhead, appointment time and cash costs side by side. Look at profit per total mile and how long the truck will be committed. Use your fleet’s purchase price or fuel card data for a quote. The EIA’s weekly diesel series is a regional benchmark, not the price a driver will pay at a specific stop.
Define where the load begins and ends for your decision
The route on a rate confirmation often tells you how far the shipment travels. Your truck may start from a different location. Map from its realistic position after the prior stop, including the time needed to unload, park or return equipment. Then map from pickup to the last delivery. If the job leaves the truck somewhere different from the planned home base or reload area, estimate those additional miles separately. This produces two clear views of the trip. One ends at delivery. The other shows the effect of the expected move after delivery.
A dispatch office can keep both measures on one line. Write current position, pickup position, last delivery, empty miles before pickup, loaded miles, paid extra miles and estimated empty miles after delivery. State whether the billed amount is confirmed or awaiting approval. If a later load is actually booked, record which job receives its repositioning miles so that a weekly report does not charge the same miles twice. If that reload is still speculative, show the post-delivery move as an estimate rather than leaving it out of the decision.
The chosen cutoff should match the question. If two jobs end at the same location at similar times, it may be sufficient to compare costs through delivery and use the same onward assumptions. If one takes the truck to a customer with regular reloads and the other finishes far from any predictable freight, add an onward scenario. What matters is writing down the assumption so a carrier can evaluate it after the trip instead of trying to remember why the posted rate appeared attractive.
Compare two offers before comparing their advertised rate
Imagine a carrier considering two day runs. Offer A pays $1,440 for 400 loaded miles and requires an empty drive of 120 miles to pickup. Offer B pays $1,320 for 420 loaded miles with an empty drive of 20 miles. A’s advertised rate is $3.60 per loaded mile and B’s is about $3.14. Dividing revenue by all miles through delivery gives about $2.77 for A and exactly $3.00 for B. That switch comes entirely from putting a different distance in the denominator.
Add example variable costs of $1.47 for each mile through delivery and $110 per run for a daily allocation. A’s estimated cost is $874.40 and leaves $565.60. B’s estimated cost is $756.80 and leaves $563.20. A slightly leads in estimated dollars for the trip under those assumptions. At nine hours committed, A leaves roughly $62.84 per committed truck-hour. If B takes seven and a half hours, it leaves roughly $75.09 per truck-hour. The most relevant result depends on what the next commitment can use. An empty hour at the end of the day matters differently from enough time to complete another paid stop.
Now add an illustrative 70 empty miles to reach a reload area after A and 25 after B. At the same $1.47 per mile, those moves cost $102.90 and $36.75 respectively. The contributions decline to $462.70 for A and $526.45 for B before any other cost or time for the additional move. If a guaranteed reload at A’s destination eliminates that assumption, recalculate A without those 70 miles. Keep a record of why you included or excluded the move. The original advertised rates did not change in either scenario.
Price the trips with costs your fleet actually incurs
Start a cost sheet with rows for fuel, driver compensation, maintenance and tires, tolls, permits where applicable, parking and other direct expenses. Some expenses vary roughly with miles while others depend on time, a crossing or an appointment. A per-mile allowance is useful when it matches an expense that behaves that way. A fixed bridge toll belongs to the specific trip. Splitting costs by what causes them makes it easier to change one input without affecting everything else.
Use a separate row for how the truck is funded and insured. Many carriers use a daily or monthly allocation for payments, insurance and overhead. Choose a consistent method based on realistic operating days or miles. A lease payment due this month is a cash obligation regardless of which load you accept, while the truck still needs to earn enough over time to support that cost. On an individual decision sheet, show the contribution after incremental costs and after your agreed overhead allocation. Over a week or month you can reconcile which figures have covered the actual fixed bills.
Include a maintenance reserve derived from your own records or a defensible estimate. An oil change may be predictable while a breakdown is not. If you divide $4,800 of maintenance and tire expense across 60,000 miles in a historical period, the resulting allocation is eight cents per mile. Ask whether that period was typical and whether any recent change in vehicle age or use alters the estimate. Using a reserve does not mean the cash leaves on each trip. It recognizes that miles today can lead to a bill later.
Estimate fuel twice when loaded and empty mileage differ
A single miles-per-gallon assumption is simple and can be appropriate if you have limited records. Better records can show meaningful differences between loaded and empty operation. As an example, assume 400 loaded miles at 6.5 mpg and 120 empty miles at 8 mpg. That is about 61.54 gallons loaded and 15 gallons empty, totaling about 76.54 gallons. At an illustrative $4.00 per gallon, the estimated fuel cost is about $306.15. A simple average of 6.5 and 8 would give 7.25 mpg, but the truck spends much more of this trip in the lower-efficiency condition. Using the simple average on all 520 miles would estimate only about 71.72 gallons.
If weather, terrain or heavy idling could affect the result, test a lower efficiency alongside the base case. For 400 loaded miles, reducing 6.5 mpg to 6.0 adds about 5.13 gallons or $20.51 at the same price, with the empty portion unchanged. This is more useful than debating which figure is exactly right before the trip. Write down the base and adverse scenarios and compare them with an actual fuel receipt and the driver’s recorded distance when the trip closes.
Use the price you reasonably expect to pay. An official regional average can help establish a starting point in the United States, while a planned fuel stop and fuel-card terms tell you more about your particular purchase. Check whether a quoted price includes taxes or is subject to a later rebate. Take care with unit changes on border routes. Miles per US gallon, miles per imperial gallon and liters per 100 kilometers cannot be substituted for one another.
Track wait time and miles separately
A load with short empty distance can still consume an extra working day if the appointments leave a long idle interval. Look up both the physical travel time and when the receiver will accept the truck. Add safety checks, breaks, loading time and expected waiting. Avoid scheduling to the shortest possible time. If your pickup and delivery span different time zones, write both appointments with the time zone beside the local time. Confirm which party can approve a different appointment after a delay.
For example, one load might leave $450 after estimated trip costs and require seven hours. Another might leave $525 and require eleven hours because it delivers after an appointment gap. Those figures work out to roughly $64 and $48 per committed truck-hour respectively. On another day, the extra $75 might matter more because neither slot would lead to a paying second job. The hour calculation helps a dispatcher discuss the trade-off with the carrier. It should never be used to pressure the driver into ignoring legal hours, rest or an unsafe deadline.
An expected detention payment is still conditional until it meets the contractual requirements and is approved. Find the free waiting period, the approved rate, the required documents and the way to report arrival. Record check-in, the point at which loading starts and actual release. A recurring $90 hold becomes more visible when the records distinguish payment received, payment claimed and time lost. Set the trip’s base estimate without any unconfirmed accessorial if recovery is uncertain.
Work out a negotiable floor from the route
Suppose a carrier estimates 480 total miles through delivery, $1.42 in variable cost for each mile, $90 of trip-specific expenses and $140 in allocated overhead. The arithmetic is 480 times $1.42, or $681.60, plus $230, giving an estimated cost of $911.60. If the carrier aims to leave $220 above this cost, the corresponding quote is $1,131.60. On 400 loaded miles that is about $2.83 per loaded mile, and across all 480 miles it is about $2.36 per mile. The broker can quote the trip in any of those formats, while the dispatcher can test it against the same cash target.
A quote can specify which costs are already in the linehaul and which charges need separate authorization. For a lane with a predictable toll, make it clear whether the offered figure covers that toll. For a load that will be dropped outside the normal operating area, explain which trip condition changes your cost. Give a precise all-in price where appropriate and retain the signed confirmation. Do not assume a text message from an unfamiliar contact modifies the paying party’s agreement.
The floor changes when the truck has a credible paid return trip, when the carrier has a planned maintenance stop near the destination or when the pickup date moves. Do not describe one number as the standard price for all loads on a lane. Keep the inputs with the figure so dispatchers on another shift can repeat the calculation and see which details need updating.
Turn the week into a lesson about lanes
After trips close, review total loaded miles, empty miles, invoices, confirmed accessorials, fuel and time. For example, a week with 1,700 loaded miles and 300 empty miles has a 15% empty-mile share of the 2,000 total miles. Compare outcomes for similar weeks with similar operating conditions. A week with one trip to collect the truck after repair might not represent your usual dispatch decisions. Preserve that classification so it doesn’t distort the comparison or disappear from the vehicle’s operating costs.
Compare the forecast with the actual result on each lane. If the actual route from pickup to delivery was 38 miles longer than planned, ask whether the difference was caused by an inaccurate route, a truck restriction or a client change. If fuel cost rose despite similar mileage, check price, vehicle efficiency and idling. If profit fell mainly because one appointment changed, adjust your anticipated time or confirmation process for similar bookings. A single pass through the variance measures provides a better response than abandoning a lane after one unusual trip.
Share a short closeout with the person quoting future freight. Include the booked and actual total miles, booked and actual truck-hours, any difference between billed and collected revenue, and the largest cost variance. Record a factual next step that can be applied to the next load. A useful example would be to verify the gate address for a specific pickup before booking, because the postal address used in the planning system previously added an unplanned detour.
Separate earnings from the date cash arrives
A profitable route can require cash well before the carrier gets paid. Compare the fuel, tolls, immediate driver requirements and other cash expenses that fall due this week with the expected payment date. Confirm where the paperwork goes and when the payment term begins. For example, a broker may start its payment clock after receiving an invoice and signed proof of delivery. If a missing signature delays acceptance of the invoice, note the actual clearance date when you plan next week’s fuel spending.
Suppose two loads have the same expected contribution but one payer offers expedited settlement for a fixed $40 charge. Record the charge as an expense if you are likely to use that option. Compare the net cash received and the number of days earlier it arrives. If ordinary settlement fits your fuel and payroll schedule, you can compare the loads without the expedited charge. Keep that settlement assumption with each estimate, especially if you rely on the fee to pay bills before the ordinary due date.
Frequently asked questions
Do empty miles always make a load worse?
Extra empty travel typically uses fuel, time and vehicle capacity. The overall decision still depends on the rate, the other costs and where the load leaves you afterward. A higher-paid trip can cover that empty movement and leave more for the carrier. Compare the actual contribution rather than assuming either that empty travel is free or that a load with empty miles must be rejected.
Should I count a stop that pays a fixed fee?
Yes. Record the stop fee as confirmed revenue if it appears on the contract, and add miles and time related to the extra stop to the cost estimate. Where the stop’s location changes, check the contract for how the added distance is handled before dispatch. A fixed fee can be straightforward even if the stop fee alone does not cover every possible detour.
What if I have no historical cost data yet?
Use written vehicle and insurance costs, current fuel quotes and reachable estimates for maintenance and driver compensation. Indicate which assumptions are provisional. Save the first several completed trips with enough detail to replace the initial estimates with your own records. Include a less favorable scenario while uncertainty remains high, especially when an inexpensive-looking rate would leave little cash after costs.
Further reading: FMCSA hours-of-service summary, freight dispatching from booking to proof of delivery and the trucking load profit calculator.
Source: US EIA gasoline and diesel pricing. See the fuel cost tool.